• Home
  • About Us
    • History
    • Quality
    • Vision
    • Facilities
  • Products
    • Product List
      • Army Standard Family
      • Cargo Bed Covers
      • Custom Expandable
      • Composite FSCS
      • Composite ISO
      • FHT LMS Trailer
      • LMT ISO Trailer
      • GMS-459 20' ISO
      • GSS-1497
      • MERWS
      • Military Trailers
      • Nato ACE
      • NAVAIR 20' ISO
      • S-250
      • S-280
      • S-710
      • S-749
      • S-788 LMS
      • Shortened LMS
    • By Platform
      • Aircraft
      • FMTV/Truck
      • Ground Based
      • HMMWV
      • Trailer
    • By Application
      • Aviation Maintenance
      • C4SI
      • Custom
      • Expandable
      • High Mobility
      • Logistical
      • Non-US Standard
      • UAV
  • Services
    • Engineering
    • Field Service
    • Modifications
    • Reset
    • Refurbishment
    • CS Login
  • Multi-Media
  • Gichner News
  • Gichner Websites
    • Gichner Systems Group
    • CMCI
    • Gichner Mobile Systems
    • Southside Container
    • Kratos
  • Contact Us
lock and key
Customer Service Login Portal
Account Login

Gichner Facilities

Home / About / Facilities

  • Dallastown, PA
  • York, PA
  • Charleston, SC
  • Walterboro, SC

Dallastown, PA

Gichner Systems Group

Plant I

Plant I encompasses over 290,000 square feet of office and manufacturing space. This large facility houses our fabrication area, which is equipped with nine Numerically Controlled (NC) machines used for piece part manufacturing. Additional NC equipment is used for routing skins, hole punching, etc. Plant I also houses a complete array of sheet metal fabrication equipment and a complete welding shop used for the fabrication of shelter components and parts. Most aluminum welding is done in accordance with AMS-STD-2219, Class C, although other types/classes of welding are also performed as required.

Plant II

Plant II has 100,000 square feet of manufacturing space and is currently being used for final assembly and integration of shelters for several large programs. This facility includes shelter erection tooling and fixtures as well as a paint booth that can be used for final painting of shelters and shelter components. It also provides a large amount of flexible expansion space allowing the manufacturing of large production jobs or programs with unique requirements.

York, PA

Gichner Systems Group

Plant III

Plant III is a dedicated service and maintenance facility that encompasses over 135,000 square feet of floor space. From simple repairs to full system overhauls, this plant provides the necessary infrastructure to restore any shelter to "like new" condition.

Charleston, SC

Gichner Systems Group

Charleston Marine Containers, Inc.

Located on the historic Charleston Naval Shipyard, CMCI's manufacturing facilities encompass over 250,000 square feet of floor space. CMCI has multiple production and installation lines available for the manufacturing, integration and testing of modular containers and other program material.

Walterboro, SC

Gichner Systems Group

Charleston Marine Containers, Inc.

CMCI's Walterboro facility is dedicated to the modification and integration of steel containers and containerized systems. With over nine acres of production capacity, CMCI Walterboro is well suited for quick reaction and prototype container manufacturing.

Learn more about:
• Gichner History
• Gichner Quality
• Gichner Vision
• Gichner Facilities

Menu
  • Home
  • Products
  • Services
  • Contact Us
Products
  • Product List
  • Products by Platform
  • Products by Application
Services
  • Field Service
  • Modifications
  • Reset
  • Refurbishment
Contact Information
  • Gichner Shelter Systems
  • 490 East Locust Street
  • Dallastown, PA 17313
  • Main: 717-244-7611
  • Sales: 877-520-1773
Gichner Shelter Systems is a Kratos Company

All rights reserved ® 2011